A monthly read on Texas inactive-well liability and Senate Bill 1150 exposure, built from the Railroad Commission's Inactive Well Aging Report (IWAR). Figures below show the current month with month-over-month change. Click a district on the map to drill in; search or sort the operator table. Note: the RRC revised its per-well plugging-cost estimate schedule for this report (the 9/10/2026 IWAR) — so the lower aggregate liability reflects that revision, not wells leaving the inventory.
Wells that truly entered or left the inactive list under each operator — not counting wells that merely changed hands.
Wells that changed operator since the last report (same well, new operator). These net to zero statewide and are excluded from the organic figures above.
| From operator | To operator | Wells transferred |
|---|
| Operator | District | Inactive | SB 1150 | Denied | Past Due | Avg Yr | Est. Liability |
|---|